We are getting closer!
Quite a lot of work was done this past week. The granite counter tops were all set. Most of the tile is done or ready to grout. The roof is done and the siding and gutters almost complete. The interior trim is ready to paint. This next week we should see our front porch and back patios get poured, the tile backsplashes and the master shower get done and our garage door installed. The appliances go in on Friday - I hope. I also think the plumber comes back to install toilets, sinks, etc. The weather is turning wintry and we are ready to get our belongings up to the mountain. Hope you are enjoying the tour.