Sunday, November 8, 2009

We are getting closer!

Quite a lot of work was done this past week. The granite counter tops were all set. Most of the tile is done or ready to grout. The roof is done and the siding and gutters almost complete. The interior trim is ready to paint. This next week we should see our front porch and back patios get poured, the tile backsplashes and the master shower get done and our garage door installed. The appliances go in on Friday - I hope. I also think the plumber comes back to install toilets, sinks, etc. The weather is turning wintry and we are ready to get our belongings up to the mountain. Hope you are enjoying the tour.

Roofing completed / Siding almost done


Yes, really! Can you believe it? It only took them 3 weeks to get the composite shingles on the roof. They are almost done with the exterior trim and siding.

Granite Close Up / Geriba Beach


Great Room Built Ins


A shadow stone will be installed soon, I think. The colors of the stone will be shades of grays, creams and rusts. A mantle will also be placed and will be stained to match the built in cabinets.

Front Door and Entry Floor w/Pinecones




Kitchen Sink area / Backsplash Close-Up




My sister, Kathryn joined me during picture taking. The center tile in the backsplash behind the stovetop is a lazered pinecone. It matches the accent tiles in the entryway that you will see in another picture.

Kitchen Island / Countertops and Backsplash