It is a huge job and is taking several days. The inside of the foundation was filled and tamped with dirt and the floor will be poured on this area (once the plumber is done with his part.) The excavators will also be reducing the gigantic pile of dirt down to the floor level and our view will return.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment